A bridge has been restored at the nature trail at Kelburn Country Centre.
A centre spokesperson said: "This was a difficult task for the team as the bridge was nearly inaccessible to vehicles and had to be completely rebuilt.
"The only vehicle able to make it down was the digger, so all of the ballast, cement, buckets, spades, wood, and tools including a cement mixer and a generator had to be carried or wheel barrowed along the trail.
"Luckily the digger managed to carry down the two 10.5m long iron girders."
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here